Projects That Define Us

A showcase of completed civil, road, drainage, bridge, and industrial works across Bangladesh.

15+ Completed Projects
5 Sectors Covered
4+ Years Active
3 Major Cities

15 projects found

Drainage 2024

U-Shaped RCC Channel — Jamal Khan Khal

Construction of U-Shaped RCC Channel along Jamal Khan Khal (CH: 1+100 to 1+184, both banks = 84m). Part of Chattogram Waterlogging Mitigation Project.

🏗️ Drainage 2024

RCC Retaining Wall — NOA Khal

Construction of RCC Retaining Wall along the bank of NOA Khal (CH: 4+255 to 4+315, L/B = 60m). Chattogram Waterlogging Mitigation Project.

🌊 Drainage 2023

Bank Protection — Khandakia Khal

Bank protection works along the right bank of Khandakia Khal at Fateh Mohammad Talukder Para Area; 150m (Sand-Cement). Flood Control & Drainage Improvement Project.

🔲 Drainage 2023

RCC Drain — Bohoddarhat Sub-Catchment 02

Construction of RCC Drain from Chosma to Dhomkhali Khal Link (CH: 0+000 to 0+760 = 760m). Chattogram Waterlogging Mitigation Project.

🔲 Drainage 2023

RCC Box Culvert — Asian Housing Society

Construction of RCC Box Culvert over Bahaddarhat: Chasma Domkhali Link Drain at Asian Housing Society. Chattogram Waterlogging Mitigation Project.

🛣️ Road 2023

Dipto Simanto Road Network — BGB HQ

Road network construction work at BGB Headquarters, Peelkhana, Dhaka. Client: Border Guard Bangladesh (BGB).

⚙️ Industrial 2022

Generator Civil Base — BAT Savar

Civil infrastructure development — Generator Civil Base and Generator Exhaust Structure at BAT Savar. Client: B-Trac Engineering Ltd.

🌉 Bridge 2022

9m RCC Girder Bridge — Bamonshahi Khal

Construction of 9.00m long RCC Girder Bridge over Bamonshahi Khal (Ch 2+133m) near Evercare Hospital. Chattogram Waterlogging Mitigation Project.

🛣️ Road 2022

Approach Road — Bamonshahi Khal Bridge

Construction of approach road with RCC Guide Wall for the 9m RCC Girder Bridge over Bamonshahi Khal at Evercare Hospital, Chattogram.

🛣️ Road 2022

RCC & Flexible Road — Tripura Khal

Construction of RCC Road & Flexible Road along Bank Tripura Khal (CH: 0+000–0+200 & 0+855–1+370 = 715m). Chattogram Waterlogging Mitigation Project.

🔲 Drainage 2021

RCC Box Drain — Chandgaon to Ek-Kilometer

Construction of RCC Box Drain at Ek-Kilometer (Bohoddarhat: Chandgoan Thana to Ek-Kilometer), Length = 80m.

🔲 Drainage 2021

RCC Drain — Chandgaon Thana (KHA-PD-E-817)

Construction of RCC Drain, Drain ID: KHA-PD-E-817 (CH: 0+000 to 0+545 = 545m). Chattogram Waterlogging Mitigation Project.

🛣️ Road 2021

RCC Road — Rajakhali 01 & 02

Construction of RCC Road at Rajakhali-01 & 02 (Ch.0+000–0+047 & Ch.0+000–0+300 = 347m, right side). Chattogram Waterlogging Mitigation Project.

🔩 Industrial 2021

Sheet Pile Works — Bangla Trac Power Unit-2

Supply and driving of sheet pile work for Bangla Trac Power Unit-2 Ltd.

🏭 Industrial 2020

Support Structure — 100MW HFO Power Plant

Supply, fabrication, and erection of support structures at 100MW HFO Power Unit-2, AISL, Julda, Chittagong.